Helping 466 households from Binh Trieu,Thang Binh in Vietnam access drinking water. The system is managed by the local Hamlet.

Narrative

Historical Data Imported.

Helping 466 households from Binh Trieu,Thang Binh in Vietnam access drinking water. The system is managed by the local Hamlet. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2006 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2006 Preparation Phase

Helping 466 households from Binh Trieu,Thang Binh in Vietnam access drinking water. The system is managed by the local Hamlet.

Narrative

Historical Data Imported.

Helping 466 households from Binh Trieu,Thang Binh in Vietnam access drinking water. The system is managed by the local Hamlet. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine

Impact

People Impacted: 1864

People Getting Safe Drinking Water: 1864

Member Specific Project Data

Chemicals Added:
Comments on Solutions:
Comments on Status: Good
Length of Pipe System (m): 9644
Project Type: U
Treatment Type: pressure
Water Source: G
Notes: OK
Cost in Local Currency: 599850000

Funding

funded:
$27,900
Final Cost:
$27,900
edit $27,900:
Gap Inc.

Plan/Proposal