Helping 261 households from Tam Nghia,Nui Thanh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).
Narrative
Historical Data Imported.
Helping 261 households from Tam Nghia,Nui Thanh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2007 Preparation Phase
Helping 261 households from Tam Nghia,Nui Thanh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).
Narrative
Historical Data Imported.
Helping 261 households from Tam Nghia,Nui Thanh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine
Sustainability
Creating and measuring long-term impact
Storage tank/construction, Treatment, Electro-mechanical (pumps, etc.), Surface water quality, Surface water availability
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: Groundwater availability,Groundwater quality,Electro-mechanical (pumps, etc.),Treatment,Storage tank/constructon Main Reason for Problem: , , ,Poor (technical) maintenance,Water quantity/quality declined over time
Impact
People Impacted: 1170
People Getting Safe Drinking Water: 1170
261.0