Helping 365 households from Dien Tien,Dien Ban in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).
Narrative
Historical Data Imported.
Helping 365 households from Dien Tien,Dien Ban in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine & alum
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2007 Preparation Phase
Helping 365 households from Dien Tien,Dien Ban in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).
Narrative
Historical Data Imported.
Helping 365 households from Dien Tien,Dien Ban in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine & alum
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: , , , ,Groundwater availability, Main Reason for Problem: ,EMW planning, design & implementation,Poor (technical) maintenance,Funding/financial problems,Water quantity/quality declined over time
Impact
People Impacted: 1825
People Getting Safe Drinking Water: 1825
365.0