Helping 220 households from Binh Dao,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative.
Narrative
Historical Data Imported.
Helping 220 households from Binh Dao,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2007 Preparation Phase
Helping 220 households from Binh Dao,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative.
Narrative
Historical Data Imported.
Helping 220 households from Binh Dao,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine
Sustainability
Creating and measuring long-term impact
Storage tank/construction, Treatment, Electro-mechanical (pumps, etc.), Surface water quality,
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: , , ,Groundwater quality,Electro-mechanical (pumps, etc.) Main Reason for Problem: , , ,Water quantity/quality declined over time,Other
Impact
People Impacted: 990
People Getting Safe Drinking Water: 990
220.0