Helping 65 households from Tam Lanh,Phu Ninh in Vietnam access drinking water. The system is managed by the local Communal People's Committee.
Narrative
Historical Data Imported.
Helping 65 households from Tam Lanh,Phu Ninh in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: . The following chemicals are added:
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2010 Preparation Phase
Helping 65 households from Tam Lanh,Phu Ninh in Vietnam access drinking water. The system is managed by the local Communal People's Committee.
Narrative
Historical Data Imported.
Helping 65 households from Tam Lanh,Phu Ninh in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: . The following chemicals are added:
Sustainability
Creating and measuring long-term impact
Treatment, Electro-mechanical (pumps, etc.), Groundwater quality, Groundwater availability,
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: ,Surface water quality,Electro-mechanical (pumps, etc.),Treatment,Distribution network,Main Reason for Problem: , ,EMW planning, design & implementation,Poor (technical) maintenance,Water quantity/quality declined over time
Impact
People Impacted: 292
People Getting Safe Drinking Water: 292
65.0