Helping 400 households from Ba Sao,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 400 households from Ba Sao,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 400 households from Ba Sao,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 400 households from Ba Sao,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 2000

People Getting Safe Drinking Water: 2000

400.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 6296
Comments on Status: Good
Comments on Solutions:
Notes: Good,PE want to extend pipeline sytem (5 km for 200 more HHs connection) and a new well 390 m deep
Cost in Local Currency: 233660613.25

Funding

funded:
$10,867
Community:
$9,606
Final Cost:
$62,744
edit $10,867:
AusAID

Plan/Proposal