Helping 620 households from Phu Long,Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 620 households from Phu Long,Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 620 households from Phu Long,Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 620 households from Phu Long,Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Sustainability

Creating and measuring long-term impact

Storage tank/construction, Treatment, Groundwater quality, ,

Impact

People Impacted: 3100

People Getting Safe Drinking Water: 3100

620.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 18650
Comments on Status: Good
Comments on Solutions: PE want to extend pipeline sytem (5 km for 300 more HHs connection)
Notes:
Cost in Local Currency: 233660613.25

Funding

funded:
$10,867
Community:
$14,889
Final Cost:
$97,579
edit $10,867:
AusAID

Plan/Proposal