Helping 200 households from Tan Thuan Dong,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).
Narrative
Historical Data Imported.
Helping 200 households from Tan Thuan Dong,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2010 Preparation Phase
Helping 200 households from Tan Thuan Dong,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).
Narrative
Historical Data Imported.
Helping 200 households from Tan Thuan Dong,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: , , ,Groundwater quality,Treatment, Main Reason for Problem: , , , ,Water quantity/quality declined over time
Impact
People Impacted: 1000
People Getting Safe Drinking Water: 1000
200.0