Helping 722 households from Long Hung A,Lap Vo in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 722 households from Long Hung A,Lap Vo in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 722 households from Long Hung A,Lap Vo in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 722 households from Long Hung A,Lap Vo in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 3610

People Getting Safe Drinking Water: 3610

722.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 17550
Comments on Status: Good
Comments on Solutions:
Notes: Good,Due to the needs increased (for 60 more HHs connections), PE want to have 1 more well (285 m deep) and pipeline extension (6 km)
Cost in Local Currency: 592926349.038109

Funding

funded:
$27,577
Community:
$4,199
Final Cost:
$56,666
edit $27,577:
GPOBA

Plan/Proposal