Helping 236 households from Tan Ly Dong,Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 236 households from Tan Ly Dong,Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 236 households from Tan Ly Dong,Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 236 households from Tan Ly Dong,Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 944

People Getting Safe Drinking Water: 944

236.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): N/A
Comments on Status: Good
Comments on Solutions: Pipeline extension (8 km) for 50 HHs connections
Notes: Good,PE want to improve water quality
Cost in Local Currency: 917960769.042931

Funding

funded:
$42,695
Community:
$10,537
Final Cost:
$71,089
edit $42,695:
GPOBA

Plan/Proposal