Helping 558 households from My Hanh Dong ,Cai Lay in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 558 households from My Hanh Dong ,Cai Lay in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 558 households from My Hanh Dong ,Cai Lay in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 558 households from My Hanh Dong ,Cai Lay in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 1608

People Getting Safe Drinking Water: 1608

558.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): N/A
Comments on Status: Good
Comments on Solutions: Due to the needs increased (for 60 more HHs connections), PE want to have 1 more well (285 m deep) and pipeline extension (6 km)
Notes: Good
Cost in Local Currency: 697533715.382006

Funding

funded:
$32,443
Community:
$4,480
Final Cost:
$55,806
$32,443:
GPOBA

Plan/Proposal