Helping 250 households from My Quy ,Thap Muoi in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 250 households from My Quy ,Thap Muoi in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 250 households from My Quy ,Thap Muoi in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 250 households from My Quy ,Thap Muoi in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 1250

People Getting Safe Drinking Water: 1250

250.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 8645
Comments on Status: Good
Comments on Solutions: PE want to extend pipeline sytem (4 km for 150 more HHs connection)
Notes: Good
Cost in Local Currency: 1029224988.94566

Funding

funded:
$47,870
Community:
$6,238
Final Cost:
$83,142
edit $47,870:
GPOBA

Plan/Proposal