Helping 130 households from Hoa Dinh,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 130 households from Hoa Dinh,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 130 households from Hoa Dinh,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 130 households from Hoa Dinh,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 520

People Getting Safe Drinking Water: 520

130.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): N/A
Comments on Status: Good
Comments on Solutions:
Notes: Good
Cost in Local Currency: 584121192.390315

Funding

funded:
$27,168
Community:
$3,984
Final Cost:
$50,186
$27,168:
GPOBA

Plan/Proposal