Helping 700 households from Luong Hoa Lac,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).
Narrative
Historical Data Imported.
Helping 700 households from Luong Hoa Lac,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2010 Preparation Phase
Helping 700 households from Luong Hoa Lac,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).
Narrative
Historical Data Imported.
Helping 700 households from Luong Hoa Lac,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:
Impact
People Impacted: 2800
People Getting Safe Drinking Water: 2800
700.0