Helping 384 households from Dang Hung Phuoc,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 384 households from Dang Hung Phuoc,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2011 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2011 Preparation Phase

Helping 384 households from Dang Hung Phuoc,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 384 households from Dang Hung Phuoc,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 1920

People Getting Safe Drinking Water: 1920

384.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): N/A
Comments on Status: Good
Comments on Solutions: PE want to extend pipeline sytem (2 km for 30 more HHs connection)
Notes:
Cost in Local Currency: 402057740

Funding

funded:
$18,700
Community:
$6,052
Final Cost:
$37,640
$18,700:
AusAID

Plan/Proposal