Kristen Kosinski's Visit- February 2011
-Well was never completed
-Driller left hole unsecured and it was tampered with; driller was unable to pipe and install pump.
-Well will be cleared and equipped in August 2011.
-Well was never completed
-Driller left hole unsecured and it was tampered with; driller was unable to pipe and install pump.
-Well will be cleared and equipped in August 2011.