Site Selection DAY 1
After surveying 5 sites, a viable well location was found. Lucas had to work closely with the community to convince them that TSP would actually follow through on well drilling. They have been given promises twice before which made them very gun shy. If we had not entered with a Samburu, the project would likely not have gotten off the ground.