Self-supporting community- based mitigation program that provides arsenic safe water using modified dugwells along with public education on water related health effects.
Narrative
The new site PW#221 is donated by Gyanendro Mondol of village Polta of Gobindopur Panchayet in Swarupnagar Block of N 24 Parganas.
Three site in Bangaon area and three sites in Ranaghat area got cancelled due to layout of pipeline for water supply was supposed to start.
Site selection is ongoing that includes community (village) meeting, recording of the geocode of the site proposed by the community.
-
About 1 Year after completion 30 Jan, 2014
Operating Status:
there is 19ft of water 500ml theoline 12families 63people good water used for drinking and cooking
-
About 1 Year after completion 19 Nov, 2013
Operating Status:
set handpump today.
-
About 1 Year after completion 19 Nov, 2013
Operating Status:
Health meeting has been finished. M-13, F-5, Ch-8.
-
About 1 Year after completion 4 Nov, 2013
Operating Status:
handpump stolen talking to villager and gp member
-
10 Months after completion 6 Sep, 2013
Operating Status:
set washer,planjar today.
-
8 Months after completion 10 Jul, 2013
Operating Status:
I am doing demography .
-
About 1 Month after completion 4 Dec, 2012
Operating Status:
there is 10families 34people 17ft water500ml theoline was given .drinking and cooking
- Impact Assessment (M&E) Phase Project completed on 31 Oct, 2012 Implementation Phase
-
8 Months after start 4 Jul, 2012
- Implementation Phase Project started on 1 Nov, 2011 Preparation Phase
Self-supporting community- based mitigation program that provides arsenic safe water using modified dugwells along with public education on water related health effects.
Narrative
The new site PW#221 is donated by Gyanendro Mondol of village Polta of Gobindopur Panchayet in Swarupnagar Block of N 24 Parganas.
Three site in Bangaon area and three sites in Ranaghat area got cancelled due to layout of pipeline for water supply was supposed to start.
Site selection is ongoing that includes community (village) meeting, recording of the geocode of the site proposed by the community.
Other Issues
Unusual and unexpected issues faced during project execution
Pipes of 25 bore dugwells have arrived in 3 weeks after placing the order. The construction team is engaged in conducting site selection procedures while the awareness team is continuing with awareness programs in schools and communities in the areas where dugwells are in operation.
Impact
People Getting Safe Drinking Water: 40
According to the register record of October 2012 the number of Families=9; total consumers=45; Male=22, Female=23, children <5 = 4 and students =12
Maintenance/Operating Costs Annual, in US$: $40
Creating and measuring long-term impact
Implementer: Project Well & Aqua Welfare Society
Aqua Welfare Society (AWS) is the partner NGO of Project Well.
Funding
- funded:
- $1,073