Report: Extension-PULAY WATER SYSTEM

The project will consist of the repairs to two existing spring boxes for future use and the replacement of inadequate tubing in one sector of the village. The village will provide all of the materials and we will provide two weeks labor remaining from the

2009-01-15
2009-01-30
$2,123
$2,123
350

260 Families are connected to the water system to be augmented and 90 families are not. We made a design during the work to modify the entire system provided funds are available.

0

0

0

Drinking Water - Community
Hygiene Education

The repairs to the spring boxes will allow the village to connect these extra spring in the future when needed. The laying of new larger pipe in sector #3 of the village will allow for better flow to homes.

$0

The village has an established maintenance program and trained men to work on the system

The original project #108 was to increase the amount of flow to the distribution tanks. This extra projects is to make improvements as funds allow to create better distribution of water to one sector of the village experiencing flow problems.

Project Summary

Project ID 125
Owner : Agua Para La Salud (APLS)
Country : Guatemala
Go to : Application (Proposal)
Status : Completed

Project Verification

Self Verified? : No
By 3rd Party? : No

Funding

Site(s) (1)

Main Project Report

Implementation Phase Reports (0)

  • None

Operating Status Reports (0)

  • None

Peer Reports (0)

  • None

Visitor Reports (0)

  • None

Have you visited this project?