The Kalampatzom water system first stage was completed in 2008 which consisted of a 3140 meter conduction line connecting a spring box to a 5 cubic meter distribution tank. The project will serve about 54 families presently and an anticipated 100.
| Project ID | : | 182 |
| Owner | : | Agua Para La Salud (APLS) |
| Country | : | Guatemala |
| Go to | : | Application (Proposal) |
| Status | : | Completed |
