Home
AnalytiX
Map
About
Blog
Member Login
Attachment Details
Attached to Project:
Arsenic free bore-dugwell (PW125NRDH3) funded by Blue Planet Run Foundation (MSSCT)
Title:
PW125: Construction of the bore-dugwell is complete. Photo was taken on 29 June.
Description:
Size: 2.75 MB | Uploaded almost 2 years ago on Fri, 02 Jul, 2010
Click image to enlarge to the full size that was originally uploaded.
© 2006-2012 Peer Water Exchange