Report: Piped water system at Dai Hoa

Design and construction of a water system, reuse the pre-existing water tower with a capacity of 80 m3, pump installation, water treatment, 22,059 m of water transmission and distribution pipelines, electrical and control systems.

2009-05-01
2009-12-31
$0
$0
7,026
7,026

Dai Hoa Commune is located in the south-east of Dai Loc Province and is located 40 km from Danang City. It is located on a flat area near the Thu Bon River. The commune has 7,026 people living in 1,577 households. About 80% of the population subsists on farming and the rest have small businesses or work as hired laborers. The poverty rate (defined as average monthly per capita income of $12 or less) in the commune is 19%, ie 300 households.
Dai Hoa Commune obtains drinking and washing water from drilled and dug wells. Water from the wells has high levels of sediment. Some high income households purchase bottled drinking water at a cost of 20,000 VND (about $US1.10) for 20 liters. However, poorer residents use makeshift manual stone and sand filters to treat well water or are limited to using the polluted well water for their daily activities.
About 85% of household have sanitary latrines (septic and semi septic systems). All the residents are interested in building partly subsidized self contained septic tank latrines.
There is a critical need for access to clean water for the residents in this area because water related health issues are common in the area.

0
0
0
Drinking Water - Community
Hygiene Education

¥ Assessment of the needs of local residents for safe water and improved sanitation and hygiene in the project area.
¥ Assessment of the willingness and ability of beneficiaries to pay for both initial investment costs for house connections and monthly consumption-based water tariffs; and, contribution of labor to the construction for digging and backfilling pipeline trenches.
¥ Identification of the highest capacity, best quality and most reliable supply of clean water in the area (water will be taken from the Thu Bon River).
¥ Water quality testing of the Thu Bon River, and certification of the source as fit for drinking before commencement of design and construction.
¥ Holding consultation meetings with potential beneficiary groups and the local authorities in order to allow everyone to voice their concerns and opinions about the proposed project as well as to share local knowledge and experience about hygiene and clean water usage.
¥ The following standard activities will be carried out: design and construction of the water storage tank(s), river water intake, intake pipe, electrical and control systems, water treatment system (as determined by the water quality test results), and the water transmission and distribution systems (about 22,059 m). A water production meter will be installed on the outlet to the main distribution line to help monitor water production and downstream water losses.
¥ Technical and management skills training of Water Managers and the Project Management Board to make sure the proper system maintenance will be undertaken when the EMW involvement ceases.
¥ Carry out a hygiene and sanitation behavioral change program to maximize the community health benefits of the new water supply system. The EMW Hygiene and Sanitation Behavioral Change (HSBC) program will raise awareness, provide training and provide financial incentives to help families build latrines and carry out social marketing activities to encourage people to adopt more effective hygiene and sanitation behaviors.

$0
The local authorities of Dai Hoa Commune and Dai Loc District, EMW and the residents Giao Thuy, Bo Bac, Hoa Thach, Bo Nam, Bau Tay, and Quang Hue Hamlets.

Project Summary

Project ID 283
Application ID : 278
Owner : East Meets West Foundation
Status : Under Progess i.e. the project has already begun
Country : Vietnam
Last Report
  Update
: None
Last Progress/
  Status Report
: None

Funding

Photos and Documents

  • No attachments yet

Main Project Report

Implementation Phase Reports (0)

  • None

Operating Status Reports (0)

  • None

Peer Reports (0)

  • None

Visitor Reports (0)

  • None

Have you visited this project?