Before the initiation of the project, the people were faced acute drinking water problem in summer. During this period, due to the project intervention there was plenty of water. Earlier the water was provided through four common stand posts, resulting more wastage of the water and becoming marshy land in the surroundings of the houses and in the village.
Now as individual tap connections are provided through the project, all the families get water at their doorstep. The degree of wastage water has been reduced. All the families have made the provision for safe disposal of wastewater through either soak pits or kitchen garden, therefore, there is no flowing wastewater in the surroundings of houses or in the village as seen earlier. The village now looks orderly and clean without marshy land. The village has become tanker free. Henceforth, the people will not have to depend on the irregular supply of water through tankers. Since there is sufficient water, all the families make use of the toilets. The village community especially, women and girls are very happy, as now they have sufficient time for other productive activities as they don’t have to fetch water for about 3-4 hours per day which has saved their time and also reduced their drudgery.
The drinking water has been provided to the primary school and kinder garden. Therefore, now there is access to the drinking water and water for school toilets as well as for the school garden. Since there is sufficient water available for the school, the villagers have erected permanent wire mesh compound in the school premises for the school garden. In the rainy season, the flower and show plants will be planted by the schoolchildren. Due to the successful implementation of the project, there is greater cooperation among the people, and the people are united due to the common cause of drinking water.
The maintenance Revenue model is worked out. In the revenue model, we have considered the operational costs, such as electric bill, honorarium to the caretaker and water distributor, regular maintenance cost like, TCL powder (chlorination), cocks, etc. Besides this, the provision for the reserve fund of 20 % of the annual cost is made, so as to ensure the sufficient fund for the replacement of major parts of the pump, minor repairs of the valves, pipes etc. after 5-7 years period. As per the Revenue generation model the maintenance cost works out to 802 USD. However, the Gram Panchayat has collected USD 1169 towards the maintenance cost per year. Besides this the Gram Panchayat has collected deposit of $ 10.63 from each family. The total deposit of $ 1670 is collected from 157 families.