Water For People measures the impact of its work in both quantitative and qualitative outcomes. In terms of the water system, a total of 137 water connections were provided:
-126 household tapstands
-6 additional families benefiting with a domestic service line up to their cut-off valve
-5 public tapstands
-2 for the junior high/high school
-1 for the elementary school
-1 for the health post
-1 for the principal plaza
Additional outputs of the water system included the construction of three spring catchment works, two break-pressure tanks in the main supply, two small collector tanks, a 20,000 liter storage tank, and piping throughout the system.