Report: PULAY WATER SYSTEM AUGMENTATION

The project will consist of the construction of a spring box ; conduction line of 5.2 km; a 5 cubic meter storage tank;and repairs of an existing storage tank.

2008-10-20
2009-01-15
$24,761
$26,884
2,100

Our original submission indicated that there were about 250 families in the village. During the project the village water committee indicated that they had only given us the number of families connected to the system. In reality many young families living with parents and families not connect to the system raised the total number of families to about 350.

0

The school facilities were examined and for the most part are functioning well. The village last year built a new set of flush toilets for the school. Hand washing facilities are available at the school

0

The majority of the homes have some form of human waste disposal that feeds into a system of public sewers. Those families distant from this system have latrines.

2,100

Health and higiene education was carried out housey house and in public meetings.

Drinking Water - Community
Hygiene Education

The Pulay Water Project is complete with all elements of the project installed and functioning. The project is two weeks ahead of schedule with the finish. In consultation with the village water committee and Rahesh the plan is to enclose another spring site that the village has recently purchased so as to make this water available for future needs. The village has been very cooperative and raised about Q35,000 ($5,000) during the project and with these funds made a number of improvements to their distribution system the the houses in the village. We anticipate being finished by the end of Jan. with the project.

$300

We are currently working with the village to develop a maintenance program including the new facilities.

A second phase of this project is planned provided funds can be found. During the project a study was done of the distribution system to the houses. Thefindings indicated that about 90 families were not connected to the water system. We have developed a plan and design to renovate the entire water distribution system to provide sufficient flow to all the houses for a period of 20 years utilizing the old and new springs on line in the village.

See final report

Project Summary

Project ID 89
Owner : Agua Para La Salud (APLS)
Country : Guatemala
Go to : Application (Proposal)
Status : Complete - Success, Late

Project Verification

Self Verified? : No
By 3rd Party? : No

Funding

Site(s) (1)

Main Project Report

Implementation Phase Reports (1)

Operating Status Reports (0)

  • None

Peer Reports (0)

  • None

Visitor Reports (0)

  • None

Have you visited this project?