A borewell had been constructed on the north end at 2nd cross of 12th main. This was considered a backup in case the primary borewell fails. This add-on project installed a pump and all the piping required to the bottom of the main overhead tank.
A met
-
Rajesh Shah of Peer Water ExchangeOperating Status: no_data Sun 20 Sep 2020, Over 4 Years ago
None
None
- Impact Assessment (M&E) Phase Project completed on 4 Dec, 2009 Implementation Phase
- Implementation Phase Project started on 1 Mar, 2009 Preparation Phase
A borewell had been constructed on the north end at 2nd cross of 12th main. This was considered a backup in case the primary borewell fails. This add-on project installed a pump and all the piping required to the bottom of the main overhead tank.