The primary hand-washing station and the pre-primary bathroom will be repaired. Additionally a hand-washing station with three taps in height adequate for the pre-primary children will be installed.

Narrative

The repair of the existing handwashing stations and the installation of a new handwashing station allows the children sufficient locations to wash hands after bathroom use and before meals.

  • Maria Consoli Bartrum
    • Visitor
    • confidential
    Implementation Status: completed Thu 28 Feb 2013, Almost 12 Years ago

    The Canaquil School

    On our way to visit the health clinics in the villages of Ixil, we were able to stop over and visit The Canaquil School, which has a beautiful hand washing station. Today rivaled the other days in terms of poor quality of roads and driving conditions. These are very difficult areas to get to and thus very important places to have health centers and schools with effective hygienic practices in place

    • _DSC4617...
    • _DSC4612...
    • _DSC4609...
    • _DSC4595...
    • _DSC4587...
    • _DSC4577...
    • _DSC4576...
  • Lynn Roberts of Agua Para La Salud (APLS)
    • confidential
    Implementation Status: completed Sat 31 Oct 2009, About 15 Years ago

    KANAQUIL SCHOOL HYGIENE PROJECT

    PROJECT COMPLETE SEE REPORTS ATTACHED

    • KANAQUIL...
    • school_0...
  • Lynn Roberts of Agua Para La Salud (APLS)
    • confidential
    Implementation Status: completed Sat 10 Oct 2009, About 15 Years ago

    KANAQUIL SCHOOL HYGIENE PROJECT

    See attached final report for comments

    • KANAQUIL...
    • KANAQUIL...
  • Impact Assessment (M&E) Phase Project completed on 10 Jul, 2009 Implementation Phase
  • Implementation Phase Project started on 10 Jul, 2009 Preparation Phase

The primary hand-washing station and the pre-primary bathroom will be repaired. Additionally a hand-washing station with three taps in height adequate for the pre-primary children will be installed.

Narrative

The repair of the existing handwashing stations and the installation of a new handwashing station allows the children sufficient locations to wash hands after bathroom use and before meals.

Sustainability

Creating and measuring long-term impact

APS has a maintenance program to assist and train school teachers and village committees in the repair and maintenance of facilities. The village recieves Q50 per child from the government to run the schools and part of these funds are used to maintain facilties.

Other Issues

Unusual and unexpected issues faced during project execution

The installation of check valves on the bathroow storage tank was not anticipated , but was included in the project at minimal cost.

Impact

People Impacted: 600

People Getting Safe Drinking Water: 180

The community consists of 72 households with a total of approximately 600 inhabitants. The project will be executed on the premises of the local school. In which 7 teachers educate 173 children, thereof 88 boys and 85 girls.

School Children Getting Water: 180

Hand washing stations and bathroom facilities were repaired.

People Getting Sanitation: 180

Hand washing stations and bathroom facilities were repaired.

People Getting Other Benefits: 600

Improved health for the entire community

Maintenance/Operating Costs Annual, in US$: $100

Creating and measuring long-term impact

APS has a maintenance program to assist and train school teachers and village committees in the repair and maintenance of facilities. The village recieves Q50 per child from the government to run the schools and part of these funds are used to maintain facilties.

Funding

funded:
$1,000
Final Cost:
$1,004