Helping 301 households from Hoa Minh,Lien Chieu in Vietnam access drinking water. The system is managed by the Provincial Water Company.

Narrative

Historical Data Imported.

Helping 301 households from Hoa Minh,Lien Chieu in Vietnam access drinking water. The system is managed by the Provincial Water Company. The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2008 Preparation Phase

Helping 301 households from Hoa Minh,Lien Chieu in Vietnam access drinking water. The system is managed by the Provincial Water Company.

Narrative

Historical Data Imported.

Helping 301 households from Hoa Minh,Lien Chieu in Vietnam access drinking water. The system is managed by the Provincial Water Company. The following methods were utilized for treatment: . The following chemicals are added:

Sustainability

Creating and measuring long-term impact

Distribution network, Storage tank/construction, Treatment, Electro-mechanical (pumps, etc.), Groundwater quality

Other Issues

Unusual and unexpected issues faced during project execution

Main Problems: ,Groundwater availability,Groundwater quality,Electro-mechanical (pumps, etc.),Treatment, Main Reason for Problem: , , ,Water quantity/quality declined over time,Other

Impact

People Impacted: 1136

People Getting Safe Drinking Water: 1136

301.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 2373
Comments on Status:
Comments on Solutions:
Notes: non operational,Build a new intake and treatment system at other place and reuse the distribution system.
Cost in Local Currency: 322481940

Funding

funded:
$14,999
Final Cost:
$14,999
edit $14,999:
Coca Cola

Plan/Proposal