Helping 440 households from Phong Hoa,Tuyen Hoa in Vietnam access drinking water. The system is managed by the local Communal People's Committee.

Narrative

Historical Data Imported.

Helping 440 households from Phong Hoa,Tuyen Hoa in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine & alum

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2008 Preparation Phase

Helping 440 households from Phong Hoa,Tuyen Hoa in Vietnam access drinking water. The system is managed by the local Communal People's Committee.

Narrative

Historical Data Imported.

Helping 440 households from Phong Hoa,Tuyen Hoa in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine & alum

Other Issues

Unusual and unexpected issues faced during project execution

Main Problems: ,Electro-mechanical (pumps, etc.),Treatment,Storage tank/construction,Other, Main Reason for Problem: ,EMW planning, design & implementation,Poor (technical) maintenance,Road construction,Natural causes (storm, flood, etc.)

Impact

People Impacted: 1696

People Getting Safe Drinking Water: 1696

440.0

Member Specific Project Data

Water Source: S
Project Type: N
Treatment Type: pressure
Chemicals Added: chlorine & alum
Length of Pipe System (m): 15123
Comments on Status:
Comments on Solutions:
Notes: Good . The CPC and the water operators are very good and responsible
Cost in Local Currency: 1304088509.98597

Funding

funded:
$60,655
Community:
$6,221
Final Cost:
$73,856
$60,655:
GPOBA

Plan/Proposal