Helping 423 households from Cam Thuy,Cam Lo in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 423 households from Cam Thuy,Cam Lo in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine & alum

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2008 Preparation Phase

Helping 423 households from Cam Thuy,Cam Lo in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 423 households from Cam Thuy,Cam Lo in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine & alum

Sustainability

Creating and measuring long-term impact

Other, Storage tank/construction, Treatment, Electro-mechanical (pumps, etc.),

Other Issues

Unusual and unexpected issues faced during project execution

Main Problems: , ,Groundwater quality,Electro-mechanical (pumps, etc.),Treatment, Main Reason for Problem: , , , ,Water quantity/quality declined over time

Impact

People Impacted: 1680

People Getting Safe Drinking Water: 1680

423.0

Member Specific Project Data

Water Source: S
Project Type: N
Treatment Type: pressure
Chemicals Added: chlorine & alum
Length of Pipe System (m): 21806
Comments on Status:
Comments on Solutions: The river intake needs to be moved to better location if funding available
Notes: OK. The water is a little salty
Cost in Local Currency: 1391243500

Funding

funded:
$64,709
Final Cost:
$64,709
$64,709:
GPOBA

Plan/Proposal