Helping 273 households from Tam Anh Nam,Nui Thanh in Vietnam access drinking water. The system is managed by the local Communal People's Committee.
Narrative
Historical Data Imported.
Helping 273 households from Tam Anh Nam,Nui Thanh in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: sedimentation tank, vertical gravity. The following chemicals are added: Chlorine
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2008 Preparation Phase
Helping 273 households from Tam Anh Nam,Nui Thanh in Vietnam access drinking water. The system is managed by the local Communal People's Committee.
Narrative
Historical Data Imported.
Helping 273 households from Tam Anh Nam,Nui Thanh in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: sedimentation tank, vertical gravity. The following chemicals are added: Chlorine
Sustainability
Creating and measuring long-term impact
Distribution network, Treatment, Electro-mechanical (pumps, etc.), Surface water quality,
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: , , ,Surface water availability,Electro-mechanical (pumps, etc.),Main Reason for Problem: , , , ,Water quantity/quality declined over time
Impact
People Impacted: 1020
People Getting Safe Drinking Water: 1020
273.0