Helping 254 households from Chau Hoa,Tuyen Hoa in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).

Narrative

Historical Data Imported.

Helping 254 households from Chau Hoa,Tuyen Hoa in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: sedimentation tank, pressure. The following chemicals are added: chlorine

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2008 Preparation Phase

Helping 254 households from Chau Hoa,Tuyen Hoa in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).

Narrative

Historical Data Imported.

Helping 254 households from Chau Hoa,Tuyen Hoa in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: sedimentation tank, pressure. The following chemicals are added: chlorine

Sustainability

Creating and measuring long-term impact

Groundwater availability, , , ,

Other Issues

Unusual and unexpected issues faced during project execution

Main Problems: , , , ,Electro-mechanical (pumps, etc.), Main Reason for Problem: , , ,EMW planning, design & implementation,Funding/financial problems

Impact

People Impacted: 988

People Getting Safe Drinking Water: 988

254.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type: sedimentation tank, pressure
Chemicals Added: chlorine
Length of Pipe System (m): 5458
Comments on Status: OK
Comments on Solutions:
Notes: Good
Cost in Local Currency: 495824819.985972

Funding

funded:
$23,061
Community:
$3,221
Final Cost:
$55,736
edit $23,061:
GPOBA