Helping 342 households from Binh Dao,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 342 households from Binh Dao,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2008 Preparation Phase

Helping 342 households from Binh Dao,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 342 households from Binh Dao,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: . The following chemicals are added:

Sustainability

Creating and measuring long-term impact

Electro-mechanical (pumps, etc.), , , ,

Impact

People Impacted: 1300

People Getting Safe Drinking Water: 1300

342.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 8683
Comments on Status: good
Comments on Solutions:
Notes: OK
Cost in Local Currency: 508539500

Funding

funded:
$23,653
Final Cost:
$23,653
$23,653:
GPOBA

Plan/Proposal