Helping 634 households from Thach Hoa,Tuyen Hoa in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 634 households from Thach Hoa,Tuyen Hoa in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2008 Preparation Phase

Helping 634 households from Thach Hoa,Tuyen Hoa in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 634 households from Thach Hoa,Tuyen Hoa in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 2440

People Getting Safe Drinking Water: 2440

634.0

Member Specific Project Data

Water Source: S
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 31480
Comments on Status: OK
Comments on Solutions:
Notes: OK
Cost in Local Currency: 271193905

Funding

funded:
$12,613
Community:
$6,977
Final Cost:
$19,590
edit $12,613:
GPOBA

Plan/Proposal