Helping 309 households from An Hiep,Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 309 households from An Hiep,Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 309 households from An Hiep,Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 309 households from An Hiep,Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Other Issues

Unusual and unexpected issues faced during project execution

Main Problems: , ,Groundwater quality,Treatment,Storage tank/construction, Main Reason for Problem: , , ,EMW planning, design & implementation,Water quantity/quality declined over time

Impact

People Impacted: 1545

People Getting Safe Drinking Water: 1545

309.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 14230
Comments on Status: Good
Comments on Solutions:
Notes:
Cost in Local Currency: 233660613.25

Funding

funded:
$10,867
Community:
$7,420
Final Cost:
$60,327
edit $10,867:
AusAID

Plan/Proposal