Helping 200 households from Tan Thuan Dong,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 200 households from Tan Thuan Dong,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 200 households from Tan Thuan Dong,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 200 households from Tan Thuan Dong,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Other Issues

Unusual and unexpected issues faced during project execution

Main Problems: , , ,Groundwater quality,Treatment, Main Reason for Problem: , , , ,Water quantity/quality declined over time

Impact

People Impacted: 1000

People Getting Safe Drinking Water: 1000

200.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 4800
Comments on Status: Good
Comments on Solutions: PE want to extend pipeline sytem (5 - 7 km for 500 more HHs connection) and a new well 390 m deep
Notes:
Cost in Local Currency: 233660613.25

Funding

funded:
$10,867
Community:
$6,724
Final Cost:
$36,501
$10,867:
AusAID