Helping 150 households from Ba Sao,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 150 households from Ba Sao,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 150 households from Ba Sao,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 150 households from Ba Sao,Cao Lanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 750

People Getting Safe Drinking Water: 750

150.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 3506
Comments on Status: Good
Comments on Solutions:
Notes: Good,1 more well drilling with 390m deep due to lack of water
Cost in Local Currency: 233660613.25

Funding

funded:
$10,867
Community:
$7,204
Final Cost:
$28,869
$10,867:
AusAID

Plan/Proposal