Helping 427 households from Binh Phu,Cai Lay in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 427 households from Binh Phu,Cai Lay in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 427 households from Binh Phu,Cai Lay in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 427 households from Binh Phu,Cai Lay in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 1708

People Getting Safe Drinking Water: 1708

427.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): N/A
Comments on Status: Good
Comments on Solutions: Pipeline extension (1.2 km) for 36 HHs connections
Notes: Good
Cost in Local Currency: 2373602172.19351

Funding

funded:
$110,400
Community:
$8,312
Final Cost:
$159,237
$110,400:
GPOBA

Plan/Proposal