Helping 302 households from An Nhon , Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 302 households from An Nhon , Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 302 households from An Nhon , Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 302 households from An Nhon , Chau Thanh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 1510

People Getting Safe Drinking Water: 1510

302.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 10720
Comments on Status: Good
Comments on Solutions: PE want to improve water quality
Notes: Good
Cost in Local Currency: 981395118.688

Funding

funded:
$45,646
Community:
$6,067
Final Cost:
$73,738
$45,646:
GPOBA

Plan/Proposal