Helping 150 households from Binh Thanh ,Thanh Binh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 150 households from Binh Thanh ,Thanh Binh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2010 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2010 Preparation Phase

Helping 150 households from Binh Thanh ,Thanh Binh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 150 households from Binh Thanh ,Thanh Binh in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 750

People Getting Safe Drinking Water: 750

150.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 1680
Comments on Status: Good
Comments on Solutions:
Notes: Good
Cost in Local Currency: 887634286.522503

Funding

funded:
$41,285
Community:
$2,547
Final Cost:
$73,830
edit $41,285:
GPOBA

Plan/Proposal