Helping 186 households from Hoa Dinh,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 186 households from Hoa Dinh,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2011 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2011 Preparation Phase

Helping 186 households from Hoa Dinh,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 186 households from Hoa Dinh,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 930

People Getting Safe Drinking Water: 930

186.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): N/A
Comments on Status: Good
Comments on Solutions: PE want to improve water quality
Notes: Good,Pipeline extension (about 10 km) for 500 more HHs connections; PE want to have 2 more wells (420 - 450 m deep)
Cost in Local Currency: 605624255

Funding

funded:
$28,168
Community:
$7,865
Final Cost:
$48,921
$28,168:
AusAID

Plan/Proposal