Helping 367 households from Luong Hoa Lac,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 367 households from Luong Hoa Lac,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2011 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2011 Preparation Phase

Helping 367 households from Luong Hoa Lac,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 367 households from Luong Hoa Lac,Cho Gao in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 1835

People Getting Safe Drinking Water: 1835

367.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): N/A
Comments on Status: Good
Comments on Solutions:
Notes: Good,Pipeline extension (2 km) for 60 HHs connections; 1 more well drilling 330 m deep due to lack of water
Cost in Local Currency: 463507965

Funding

funded:
$21,558
Community:
$5,600
Final Cost:
$40,045
edit $21,558:
AusAID

Plan/Proposal