Helping 109 households from Binh Phu,Cai Lay in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 109 households from Binh Phu,Cai Lay in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2011 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2011 Preparation Phase

Helping 109 households from Binh Phu,Cai Lay in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 109 households from Binh Phu,Cai Lay in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 545

People Getting Safe Drinking Water: 545

109.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): N/A
Comments on Status: Good
Comments on Solutions: Pipeline extension (2 km) for 60 HHs connections; 1 more well drilling 330 m deep due to lack of water
Notes: Good,PE want to extend pipeline sytem (2 km for 30 more HHs connection)
Cost in Local Currency: 576698360.147089

Funding

funded:
$26,823
Community:
$3,221
Final Cost:
$55,736
edit $26,823:
AusAID

Plan/Proposal