Helping households from Tam Xuan 2,Nui Thanh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).
Narrative
Historical Data Imported.
Helping households from Tam Xuan 2,Nui Thanh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: . The following chemicals are added:
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2012 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2012 Preparation Phase
Helping households from Tam Xuan 2,Nui Thanh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).
Narrative
Historical Data Imported.
Helping households from Tam Xuan 2,Nui Thanh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: . The following chemicals are added:
Sustainability
Creating and measuring long-term impact
Distribution network, Electro-mechanical (pumps, etc.), Groundwater availability, ,
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: ,, Main Reason for Problem:,,,,
Impact
Member Specific Project Data
Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): N/A
Comments on Status: Good
Comments on Solutions:
Notes:
Cost in Local Currency: 448867110
Funding
- funded:
- $20,877
- Community:
- $3,341
- Final Cost:
- $37,105
- edit $20,877:
- Fondation Albatros