Helping 300 households from Binh Phu,Thang Binh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).
Narrative
Historical Data Imported.
Helping 300 households from Binh Phu,Thang Binh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: sedimentation tank, vertical gravity. The following chemicals are added: chlorine
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2012 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2012 Preparation Phase
Helping 300 households from Binh Phu,Thang Binh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).
Narrative
Historical Data Imported.
Helping 300 households from Binh Phu,Thang Binh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: sedimentation tank, vertical gravity. The following chemicals are added: chlorine
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: , , Main Reason for Problem: , , ,EMW planning, design & implementation,Other
Impact
People Impacted: 1575
People Getting Safe Drinking Water: 1575
300.0
Member Specific Project Data
Water Source: G
Project Type: N
Treatment Type: sedimentation tank, vertical gravity
Chemicals Added: chlorine
Length of Pipe System (m): 13724
Comments on Status: Good
Comments on Solutions: The donor considers to provide more fund in 2013 to install 1 more transmission line from the dam to the treatment system to get more water for the need.
Notes:
Cost in Local Currency: 1221230960
Funding
- funded:
- $56,801
- Community:
- $11,052
- Final Cost:
- $80,741
- edit $56,801:
- Jack Anderson