Helping 500 households from Dong Trach,Bo Trach in Vietnam access drinking water. The system is managed by the local Communal People's Committee.

Narrative

Historical Data Imported.

Helping 500 households from Dong Trach,Bo Trach in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: sedimentation tank, vertical gravity. The following chemicals are added: Chlorine

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2009 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2009 Preparation Phase

Helping 500 households from Dong Trach,Bo Trach in Vietnam access drinking water. The system is managed by the local Communal People's Committee.

Narrative

Historical Data Imported.

Helping 500 households from Dong Trach,Bo Trach in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: sedimentation tank, vertical gravity. The following chemicals are added: Chlorine

Sustainability

Creating and measuring long-term impact

Electro-mechanical (pumps, etc.), Groundwater availability, Surface water availability, ,

Other Issues

Unusual and unexpected issues faced during project execution

Main Problems: , , , ,Groundwater availability, Main Reason for Problem: , , , ,Water quantity/quality declined over time

Impact

People Impacted: 2200

People Getting Safe Drinking Water: 2200

500.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type: sedimentation tank, vertical gravity
Chemicals Added: Chlorine
Length of Pipe System (m): 23700
Comments on Status: OK. The water is a little salty
Comments on Solutions:
Notes: Good
Cost in Local Currency: 1076376000

Funding

funded:
$50,064
Final Cost:
$50,064
edit $50,064:
GPOBA

Plan/Proposal