Helping 500 households from Tan Hoa,Minh Hoa in Vietnam access drinking water. The system is managed by the local Communal People's Committee.
Narrative
Historical Data Imported.
Helping 500 households from Tan Hoa,Minh Hoa in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: sedimentation tank, vertical gravity. The following chemicals are added:
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2009 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2009 Preparation Phase
Helping 500 households from Tan Hoa,Minh Hoa in Vietnam access drinking water. The system is managed by the local Communal People's Committee.
Narrative
Historical Data Imported.
Helping 500 households from Tan Hoa,Minh Hoa in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: sedimentation tank, vertical gravity. The following chemicals are added:
Sustainability
Creating and measuring long-term impact
Groundwater availability, , , ,
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: , , ,Groundwater availability,Groundwater quality, Main Reason for Problem: , , ,Water quantity/quality declined over time,Other
Impact
People Impacted: 2500
People Getting Safe Drinking Water: 2500
500.0