Helping 239 households from Tam Xuan 2, Nui Thanh in Vietnam access drinking water. The system is managed by the local Communal People's Committee.

Narrative

Historical Data Imported.

Helping 239 households from Tam Xuan 2, Nui Thanh in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2009 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2009 Preparation Phase

Helping 239 households from Tam Xuan 2, Nui Thanh in Vietnam access drinking water. The system is managed by the local Communal People's Committee.

Narrative

Historical Data Imported.

Helping 239 households from Tam Xuan 2, Nui Thanh in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 2500

People Getting Safe Drinking Water: 2500

239.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 15789
Comments on Status: OK
Comments on Solutions:
Notes: Good,Because of the increased needs, PE will have pipeline extension (about 2 km) for 100 more HHs connections.
Cost in Local Currency: 850282000

Funding

funded:
$36,102
Final Cost:
$39,548
$36,102:
GPOBA

Plan/Proposal