Helping 192 households from Binh Dao,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 192 households from Binh Dao,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2009 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2009 Preparation Phase

Helping 192 households from Binh Dao,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 192 households from Binh Dao,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 1500

People Getting Safe Drinking Water: 1500

192.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 7500
Comments on Status: OK
Comments on Solutions:
Notes: Good,PE want to extend pipeline sytem (1 km for 80 more HHs connection)
Cost in Local Currency: 206565980

Funding

funded:
$9,607
Community:
$5,385
Final Cost:
$22,094
edit $9,607:
GPOBA

Plan/Proposal