Helping 617 households from Binh Tu,Thang Binh in Vietnam access drinking water. The system is managed by the local Communal People's Committee.
Narrative
Historical Data Imported.
Helping 617 households from Binh Tu,Thang Binh in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: . The following chemicals are added:
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2009 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2009 Preparation Phase
Helping 617 households from Binh Tu,Thang Binh in Vietnam access drinking water. The system is managed by the local Communal People's Committee.
Narrative
Historical Data Imported.
Helping 617 households from Binh Tu,Thang Binh in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: . The following chemicals are added:
Impact
People Impacted: 3000
People Getting Safe Drinking Water: 3000
617.0